SEGMENT LIFTER IS USED IN THE CONSTRUCTION OF PRECAST SEGMENTAL BALANCED CANTILEVER BRIDGES. THE TECHNOLOGY HAD BEEN USED SUCCESSFULLY TO COMPLETE SEVERAL LARGE BALANCE CANTILEVER BRIDGE WORLDWIDE.
THE LIFTER IS FITTED WITH ELECTRIC WINCHES OR HYDRAULIC AND IS LAUNCH FORWARD BY HYDRAULIC SYSTEM. THE LIFTER CAN ALSO BE EQUIPPED WITH STEEL WHEELS RUNG ON RAILS OR RUBBER TYRE MOUNTED FOR INCREASED MOBILITY.
KEY PROJECT EXECUTED:
Project 01
- CLIENT : BRIDGECON SYSTEM PVT.LTD
- PLACE : BIHAR
- SCOPE OF WORK : 1300 M.T
- JOB DESCRIPTION : FABRICATION & TRIAL ASSEMBLY OF SEGMENT LIFTERS (12 SETS) FOR NEW GANGA BRIDGE PROJECT
Project 02
- CLIENT : BRIDGECON SYSTEM PVT.LTD
- PLACE : PRATAPGARH, U.P.
- SCOPE OF WORK : 200 M.T
- JOB DESCRIPTION : FABRICATION & TRIAL ASSEMBLY OF SEGMENT LIFTERS FOR KARENTIGHAT
Project 03
- CLIENT : BRIDGECON INDIA
- PLACE : JAMMU & KASHMIR
- SCOPE OF WORK : 125 M.T
- JOB DESCRIPTION : FABRICATION & TRIAL ASSEMBLY OF SEGMENT LIFTER AT ANJI KHAD RIVER FOR HCC LTD